BEST—Integrated Engineering and Technology Provider of Oil & Gas Storage and Transportation. English Chinese Subsidiary Bter Official WeChat

Scan QR code to pay attention to our BEST and share constructive industry observation, News and technological information!

BEST

Home >> Projects >> Cases

A+ | Reset | A-

CASES

Onshore gas export pipeline

 

The gas export main line starts from Atuabo Initial Station (AIS), which is combined with Gas Process Plant (GPP) located at northeast Atuabo, terminates at the northwest Takoradi Thermal Power Plant (TTPP).The main pipeline is approximately 110.9 km with 20” outside diameter; gas pipeline transmission system consists of a Atuabo Initial Station (AIS), a gas distribution station (EDS), a terminal station (TRMS) and 2 sets of block valve stations.

The gas export branch line starts from gas distribution station (EDS) located at Essiama, terminates at Prestea Regulating and Metering Station (PRMS) at Prestea. The branch is approximately 95 km and 20” outside diameter with 2 sets of block valve stations along the pipeline.


NO.Project TitleProduct namePressure levelNumber of suppliersAnnual operation
1Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipelinePressure Regulating Skid8MPa2sets2012
2Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipelineSelf-used Gas Skid8MPa1set2012
3Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipelineUltrasonic Metering Skid8MPa2sets2012

CONTACT US

BEST ENERGY EQUIPMENT CO.,LTD. Tel:+86 22 22193891/92/93
Fax:+86 22 22193895
Add:No.18 Fuyuan Road, Jingbin Industrial Park, Wuqing District, Tianjin, China
Zip code:301712
Website:www.petrobest.com
Copyright © 2015-2016 BEST