BEST—Integrated Engineering and Technology Provider of Oil & Gas Storage and Transportation. English Chinese Subsidiary Bter Official WeChat

Scan QR code to pay attention to our BEST and share constructive industry observation, News and technological information!

BEST

Home >> Projects >> Cases

A+ | Reset | A-

CASES

This project's owner is Sudan Department of Energy. It consists of diesel fuel tanks with 120 thousand cubic meters of overall oil reserves(2 set dome-roof tanks with 50 thousand cubic meters and 1 set with 20 thousand cubic meters)and several auxiliary systems'design, purchase, construction and test running works. These systems include the auxiliary tank civil engineering project, technology transporting system, automatic control system, firefighting system and electrical equipment.

 

Mass Flow Metering Skid
NO.Project TitleProduct namePressure levelNumber of suppliersAnnual operation
1Sudan Khartoum Refinery tank and DC petroleum ProjectMass Flow Metering SkidANSI6001set2007

CONTACT US

BEST ENERGY EQUIPMENT CO.,LTD. Tel:+86 22 22193891/92/93
Fax:+86 22 22193895
Add:No.18 Fuyuan Road, Jingbin Industrial Park, Wuqing District, Tianjin, China
Zip code:301712
Website:www.petrobest.com
Copyright © 2015-2016 BEST