Zhongxian - Wuhan Natural Gas Pipeline, designed in 1998 with a total length of 1,375 km, includes one 719 km truck line with a diameter of 711 mm and three branch lines. The truck line is equipped with 11 process stations and 22 block valve stations. The pipeline passes through Chongqing, Hubei, and Hunan, featured with the mountainous areas of multiple rages in western Hubei and Jianghan plain with densely distributed water network. The project successfully resolves the technical difficulties of laying pipeline in karst caves, crossing the Yangtze River four times (twice by shield tunneling) and crossing Hanjiang River. Due to its new record of difficulty in terms of China’s gas pipeline design, the project was selected as the Top Ten Innovative Projects of New Record for China’s Enterprises. Furthermore, the project was also rewarded the Silver Medal of National Excellent Project for Survey and Design in 2008 and the First Prize of Excellent Petroleum Project Design in 2008.

 

Pressure Regulating System and Self-used Gas System of Zhongxian - Wuhan Gas Pipeline Project
Self-used Gas Metering and Regulating System of Zhijiang Distribution Station
Pressure Regulating System of Huangshi Gate Station
NO.Project TitleProduct namePressure levelNumber of suppliersAnnual operation
1Huangshi Gate Station of Zhongxian - Wuhan Gas Pipeline ProjectUltrasonic Metering SystemANSI3002sets2004
2One Main Line and Three Branch Lines of Zhongxian - Wuhan Gas Pipeline ProjectSelf-Used Gas Metering and Regulating System in StationANSI60016sets2004
3Zhijiang Fertilizer Factory of Zhongxian - Wuhan Gas Pipeline ProjectPressure Regulating SystemANSI6002sets2004
4Zhijiang Fertilizer Factory of Zhongxian - Wuhan Gas Pipeline ProjectUltrasonic Metering SystemANSI6002sets2004
5Huangshi Gate Station of Zhongxian - Wuhan Gas Pipeline ProjectMetering and Regulating SystemANSI6003sets2005
6Zhongxian - Wuhan Gas Branch Pipeline ProjectPressure Regulating SystemANSI60026sets2005
7Zhongxian First Station of Zhongxian - Wuhan Gas Pipeline ProjectUltrasonic Metering SystemANSI6002sets2006
8Changyang Station of Central China Gas Pipeline CompanyMetering and Regulating SystemANSI6002sets2007
9Changyang Station of Central China Gas Pipeline CompanySelf-Used Gas Metering and Regulating System in StationANSI6001set2007
10Miluo Station of Zhongxian - Wuhan Gas Pipeline ProjectPressure Regulating SystemANSI6002sets2009
11Zhongxian - Wuhan Gas Pipeline ProjectPressure Regulating SystemANSI40018sets2010
12Zhongxian - Wuhan Gas Pipeline ProjectSelf-Used Gas Metering and Regulating System in StationANSI40013sets2010
13Reconstruction Project of Zhongxian - Wuhan Gas Pipeline ProjectPressure Regulating SystemANSI60018sets2010
14Zhongxian - Wuhan Gas Pipeline ProjectWater Jacket HeaterANSI4003sets2010

CONTACT US

BEST ENERGY EQUIPMENT CO.,LTD. Tel:+86 22 22193891/92/93
Fax:+86 22 22193895
Add:No.18 Fuyuan Road, Jingbin Industrial Park, Wuqing District, Tianjin, China
Zip code:301712
Website:www.petrobest.com
Copyright © 2015-2016 BEST