Sichuan–Shanghai gas pipeline is a 1,702 kilometers (1,058 mi) long natural gas pipeline in China. The pipeline runs from Pugang gas field in Dazhou, Sichuan Province, to Qingpu District of Shanghai. An 842 kilometers (523 mi) Long Branch line connects Yichang in Hubei with Puyang in Henan Province. Two shorter branches are located near the Puguang gas field and one in the east near Shanghai.
The construction of the first 1,360 kilometers (850 mi) long section from Yichang in Hubei Province to Shanghai started on 22 May 2007 and was completed in March 2010. The tunnel to cross Yangtze River was completed in October 2007. The tunnel is about 20 meters (66 ft) beneath the riverbed and connects two wells on each side of the river.
The capacity of the pipeline is 12 billion cubic meters (bcm) of natural gas per year. It has eight centrifugal compressors, provided by GE Oil & Gas. The operator of the pipeline is Sinopec.
Full Views of Hubei Chemical Fertilizer Branch Co. Distribution Station
Water Sleeve Stove of Hubei Chemical Fertilizer Branch Co.
Filter Separator of Hubei Chemical Fertilizer Branch Co.
Ultrasonic Metering System of Hubei Chemical Fertilizer Branch Co.
Self-used Gas Metering and Regulating System of Hubei Chemical Fertilizer Branch Co.
Pressure Control System of Hubei Chemical Fertilizer Branch Co.
|
PROJECTS
|
CONTACT US
BEST ENERGY EQUIPMENT CO.,LTD. Tel:+86 22 22193891/92/93